11/18/10
|
|
Nexans has been awarded a 10 million Euro contract by FMC Technologies to design, engineer and manufacture a static subsea control and chemical injection umbilical for the Marulk gas field on the Norwegian Continental Shelf (NCS).
|
|
More...
|
|
|
10/19/10
|
|
Nexans has been awarded a contract worth in excess of 14 million euros by BP Exploration Operating Company Ltd of Aberdeen to deliver a subsea umbilical system for the Devenick gas field in the North Sea.
|
|
More...
|
|
|
10/14/10
|
|
25,000 km of Nexans specialised FLAMEX® rail cable solutions will support power, control and data applications on new suburban trains destined for SNCF services
|
|
More...
|
|
|
10/5/10
|
|
New Qatar International Cable Company (QICC) plant in Mesaieed Industrial City is Nexans’ first manufacturing plant in an Arabic Gulf states
|
|
More...
|
|
|
9/7/10
|
|
Over 1,000 km of specialized ENERGYFLEX® PV cables have been installed by Schneider Electric at a 43 MW solar photovoltaic facility in Puglia
|
|
More...
|
|
|
8/12/10
|
|
Nexans has been awarded a Euros 64 million turnkey contract by Greece’s PPC (Public Power Corporation) to design, manufacture and install the new high-voltage AC (Alternate Current) power link between Evia and the region of Attika on the mainland.
|
|
More...
|
|
|
7/27/10
|
|
Nexans has completed successfully the test of the world’s first HVDC high temperature superconductor (HTS) power transmission cable designed for 200 kV.
|
|
More...
|
|
|
7/13/10
|
|
Nexans has been awarded a major contract by Lincs Wind Farm Limited to supply the medium voltage submarine array cables and associated accessories for the 270 MW Lincs offshore wind farm to be constructed off the east coast of England.
|
|
More...
|
|
|
7/1/10
|
|
Nexans is to launch its comprehensive new KEYLIOS™ branded range of cables, solutions and services for photovoltaic (PV) installations.
|
|
More...
|
|
|
6/21/10
|
|
Nexans has signed a Frame agreement with Nordex to supply customized WINDLINK® power cable sets and kits for onshore wind farm projects across Europe.
|
|
More...
|
|
|
6/8/10
|
|
Nexans has launched SHIPLINK™ as the new brand identity for its range of cable solutions and services for shipbuilding and offshore.
|
|
More...
|
|
|
6/8/10
|
|
Nexans uses approximately 350.000 wooden drums per year in the European Union alone. To reduce our impact on the environment, we want to recycle as many drums as possible.
|
|
More...
|
|
|
6/4/10
|
|
Nexans has successfully completed a new 75 km subsea power link between Pemba Island and the National Grid on mainland Tanzania.
|
|
More...
|
|
|
5/21/10
|
|
Tijdwinst en gemak dankzij het innovatieve afrolsysteem
|
|
More...
|
|
|
5/3/10
|
|
Nexans has developed its new HYPRON® range to provide an environmentally friendly alternative to lead-sheathed cables for onshore power, control and instrumentation applications in the oil and gas industry.
|
|
More...
|
|
|
4/27/10
|
|
Project to manufacture and install new Extra High Voltage circuits in specially constructed cable tunnels will help meet Dubai’s need for more power.
|
|
More...
|
|
|
4/19/10
|
|
Laboratory measurement within the Endesa Supercable project demonstrates real world feasibility
|
|
More...
|
|
|
4/17/10
|
|
Purchasing carbon offsets will support reforestation project in Tanzania
|
|
More...
|
|
|
4/15/10
|
|
ESPIRITO SANTO FPSO is now in operation with over 500 kilometres of halogen-free, fire-safe power, control and instrumentation cables
|
|
More...
|
|
|
4/1/10
|
|
Nexans has won the Energy Master Award 2010 for its superconducting current limiter.
|
|
More...
|
|
|
3/25/10
|
|
Dedicated cable laying ship has been lengthened by 12.5 metres to increase its cable handling capabilities.
|
|
More...
|
|
|
3/3/10
|
|
INFIT is a leapfrog technology which allows most plants to produce superior fire-performance cables using traditional extrusion techniques.
|
|
More...
|
|
|
3/2/10
|
|
Over 10,000km FLAMEX® cables to be supplied for 79 train-sets
|
|
More...
|
|
|
2/23/10
|
|
HV accessories are used for cable jointing and termination in the airport’s transformer substation.
|
|
More...
|
|
|
2/17/10
|
|
Nexans will supply a turnkey solution, consisting of Extra High Voltage (380 kV) cables, for the connection to the Swiss national power grid.
|
|
More...
|
|
|